Effective Project Management Through Applied Cost and Schedule Control

✍ Scribed by James Bent (Author); Kenneth K. Humphreys (Author)


Publisher
CRC Press
Year
1996
Leaves
477
Edition
1
Category
Library

⬇  Acquire This Volume

No coin nor oath required. For personal study only.

✦ Synopsis


This work outlines a state-of-the-art project control and trending programme, focusing on advanced applied-cost and schedule-control skills for all phases of a project at both owner and contractor level. It contains information on the three major aspects of the total project programme: the techniques and procedures utilized for a project; the exper

✦ Table of Contents


The relationship and impact of project skills: introduction and authors` mission statement; benchmarking - the technical core of TQM; the impact of personnel skills on company culture and bottom line. Cosy and schedule baselines: estimating keys - establishing a realistic baseline (typical and standard schedules); value management; economic evaluation in the process industries; keys to controlling and reducing environmental costs. Project control: contracting - front-end risks (key contract administration and cost-schedule considerations); cost and schedule trend analysis-forecasting of baselines; change control and risk analysis; range estimating; contracting - claims and extras (excluding genuine scope changes); managing small, shutdown, retrofit, or outrage projects; project closeout-lessons learned and historical data. Project management keys and interface: project management fundamentals - key elements; managing the feasibility study - pre-project planning; front-end planning and project organization (FEPPO); managing engineering-project control keys/interfaces; management procurement - project control keys/interfaces; managing construction-project control keys/interfaces.

✦ Subjects


Built Environment;Building and Construction;Construction Economics;Engineering & Technology;Engineering Management;Engineering Project Management


πŸ“œ SIMILAR VOLUMES


Integrated Cost and Schedule Control in
✍ Ursula Kuehn πŸ“‚ Library πŸ“… 2011 πŸ› Berrett-Koehler Publishers;Management Concepts 🌐 English

The Practical, Precise, and Proven Approach to Integrated Cost and Schedule Control! This trusted project management resource, now in its second edition, includes expanded coverage of how integrated cost and schedule control works within the federal government. With the renewed emphasis on transpare

Project Control: Integrating Cost and Sc
✍ Wayne J DelPico πŸ“‚ Library πŸ“… 2013 πŸ› Rsmeans 🌐 English

Reasons and methodologies for proper planning, monitoring, and controlling construction project costs and schedule<br /><br />The key to successful construction project control is the fusing of cost to schedule, enabling the management of one to help the management of the other. This requires that a

Integrated Cost and Schedule Control for
✍ Frederick Wm. Mueller CCE (auth.) πŸ“‚ Library πŸ“… 1986 πŸ› Springer US 🌐 English

<p>Management and administrative processes within the construction industry have been undergoing major changes in the last several decades. These changes have involved significant adjustments in management science and manageΒ­ ment techniques, brought about by the need for contemporary valid informaΒ­

Planning, Scheduling, Monitoring and Con
✍ APM πŸ“‚ Library πŸ“… 2016 πŸ› Association for Project Management 🌐 English

"I believe that this publication has captured the best practices for planning and will become the reference document of note for organisations and their teams during future project deliveries."David Birch, head of capital delivery project controls - National GridPlanning, Scheduling, Monitoring and

Project management with dynamic scheduli
✍ Mario Vanhoucke πŸ“‚ Library πŸ“… 2012 πŸ› Springer 🌐 English

Part 1. Scheduling Without Resources -- The PERT/CPM Technique -- The Critical Path Method -- The VMW Project -- Schedule Risk Analysis -- The Mutum-Paraná II Bridge Project (A) -- Introduction -- Part 2. Scheduling with Resources -- Resource-Constrained Project Scheduling -- Resource-Constrained