Dynasearch for the earliness–tardiness scheduling problem with release dates and setup constraints
✍ Scribed by Francis Sourd
- Publisher
- Elsevier Science
- Year
- 2006
- Tongue
- English
- Weight
- 179 KB
- Volume
- 34
- Category
- Article
- ISSN
- 0167-6377
No coin nor oath required. For personal study only.
✦ Synopsis
A large dynasearch neighborhood is introduced for the one-machine scheduling problem with sequence-dependent setup times and costs and earliness-tardiness penalties. Finding the best schedule in this neighborhood is NP-complete in the ordinary sense but can be done in pseudo-polynomial time. We also present experimental results.
📜 SIMILAR VOLUMES
This paper studies the problem of simultaneous due-date determination and sequencing of a set of n jobs on a single machine where processing times are random variables and job earliness and tardiness costs are distinct. The objective is to determine the optimal sequence and the optimal due-dates whi