𝔖 Bobbio Scriptorium
✦   LIBER   ✦

Design and installation of large diameter subsea connecting shafts for the seabrook station cooling water system : Hulshizer, A J; Nossereau, J P Proc 5th Rapid Excavation and Tunneling Conference, San Francisco, 3–7 May 198, V2, P902–929. Publ New York: AIME, 1981


Publisher
Elsevier Science
Year
1982
Tongue
English
Weight
116 KB
Volume
19
Category
Article
ISSN
0148-9062

No coin nor oath required. For personal study only.


📜 SIMILAR VOLUMES