𝔖 Bobbio Scriptorium
✦   LIBER   ✦

Design and construction of Bristol Southern foul water interceptor — stages 2 and 3 : Plenty, T N; Law, M V M In: Tunnelling '85 (paper to the Conference, Brighton, 10–15 March 1985)P187–189. Publ London: IMM, 1985


Publisher
Elsevier Science
Year
1986
Tongue
English
Weight
115 KB
Volume
23
Category
Article
ISSN
0148-9062

No coin nor oath required. For personal study only.


📜 SIMILAR VOLUMES