One of the typical error control schemes used in data transmission systems is the selective-repeat ARQ. Previously, the transmission delay for this scheme has been analyzed mostly for an independent error channel. In practice, however, the state of the channel varies with time so that error generati
โฆ LIBER โฆ
Delay analysis of selective repeat ARQ for a Markovian source over a wireless channel
โ Scribed by Jeong Geun Kim; Krunz, M.M.
- Book ID
- 114556793
- Publisher
- IEEE
- Year
- 2000
- Tongue
- English
- Weight
- 299 KB
- Volume
- 49
- Category
- Article
- ISSN
- 0018-9545
No coin nor oath required. For personal study only.
๐ SIMILAR VOLUMES
Delay performance of a selective-repeat
โ
Shumji Fujii; Yukuo Hayashida
๐
Article
๐
1998
๐
John Wiley and Sons
๐
English
โ 279 KB
Analysis and heuristics for the characte
โ
Rossi, M.; Zorzi, M.
๐
Article
๐
2003
๐
IEEE
๐
English
โ 801 KB
A selective-repeat-ARQ protocol for para
โ
Shacham, N.; Shin, B.C.
๐
Article
๐
1992
๐
IEEE
๐
English
โ 833 KB
Analysis of Stop-and-Wait ARQ for a wire
โ
Stijn De Vuyst; Krzysztof Tworus; Sabine Wittevrongel; Herwig Bruneel
๐
Article
๐
2008
๐
Springer
๐
English
โ 466 KB
A Packet Selection Algorithm for Adaptiv
โ
Zhimei Jiang; Leonard Kleinrock
๐
Article
๐
2000
๐
Elsevier Science
๐
English
โ 279 KB
This paper discusses techniques for transmitting smoothed video more efficiently over a wireless network. The fluctuation of wireless channel conditions can add a significant amount of delay to video packets and cause them to miss their play-out time. If a video is smoothed, it is possible to select
A comprehensive framework for performanc
โ
Renzo, M.; Graziosi, F.; Santucci, F.
๐
Article
๐
2010
๐
IEEE
๐
English
โ 824 KB