Analysis of transmission delay for a str
โ
Sung Jo Hong; Hideaki Takagi
๐
Article
๐
1997
๐
Elsevier Science
๐
English
โ 966 KB
We consider a priority-based packet-switching system with three phases of the packet transmission time. Each packet belongs to one of several priority classes, and the packets of each class arrive at a switch in a Poisson process. The switch transmits queued packets on a priority basis with three ph