𝔖 Bobbio Scriptorium
✦   LIBER   ✦

Delay analysis for discrete-time queueing systems with multiple randomly interrupted servers

✍ Scribed by Koenraad Laevens; Herwig Bruneel


Publisher
Elsevier Science
Year
1995
Tongue
English
Weight
879 KB
Volume
85
Category
Article
ISSN
0377-2217

No coin nor oath required. For personal study only.


πŸ“œ SIMILAR VOLUMES


Robust analysis of nonlinear discrete sy
✍ Lung-Sheng Sun; Ke-Hsiang Chen πŸ“‚ Article πŸ“… 1996 πŸ› John Wiley and Sons 🌐 English βš– 459 KB πŸ‘ 2 views

In this paper, we present the stability criteria, sufficient conditions that guarantee the robust stability of linear structured or unstructured variation of discrete time-delay systems subjected to the given bounds of nonlinear function. Both single and composite nonlinear discrete systems with mul