Channel adjustments of the lower Trinity
β
Jonathan D. Phillips; Michael C. Slattery; Zachary A. Musselman
π
Article
π
2005
π
John Wiley and Sons
π
English
β 928 KB
## Abstract Channel crossβsectional changes since construction of Livingston Dam and Lake Livingston in 1968 were studied in the lower Trinity River, Texas, to test theoretical models of channel adjustment, and to determine controls on the spatial extent of channel response. High and average flows