We consider in this paper the coordinated replenishment dynamic lot-sizing problem when quantity discounts are offered. In addition to the coordination required due to the presence of major and minor setup costs, a separate element of coordination made possible by the offer of quantity discounts nee
Cyclical schedules for the joint replenishment problem with dynamic demands
β Scribed by Ian R. Webb; Bruce R. Buzby; Gerard M. Campbell
- Publisher
- John Wiley and Sons
- Year
- 1997
- Tongue
- English
- Weight
- 75 KB
- Volume
- 44
- Category
- Article
- ISSN
- 0894-069X
No coin nor oath required. For personal study only.
β¦ Synopsis
The Joint Replenishment Problem (JRP) involves production planning for a family of items. The items have a coordinated cost structure whereby a major setup cost is incurred whenever any item in the family is produced, and an item-specific minor setup cost is incurred whenever that item is produced. This paper investigates the performance of two types of cyclical production schedules for the JRP with dynamic demands over a finite planning horizon. The cyclical schedules considered are: (1) general cyclical schedulesschedules where the number of periods between successive production runs for any item is constant over the planning horizon-and (2) power-of-two schedules-a subset of cyclical schedules for which the number of periods between successive setups must be a power of 2. The paper evaluates the additional cost incurred by requiring schedules to be cyclical, and identifies problem characteristics that have a significant effect on this additional cost.