Efficient performance tuning of parallel programs is often hard. Optimization is often done when the program is written as a last effort to increase the performance. With sequential programs each (executed) code segment will affect the completion time. In the case of a parallel program executed on a
β¦ LIBER β¦
Critical-path-analysis-based dynamic component supplier optimization
β Scribed by Huang, X. G.; Wong, Y. S.; Liu, Z. J.; Qiu, Z. M.
- Book ID
- 127226289
- Publisher
- Taylor and Francis Group
- Year
- 2005
- Tongue
- English
- Weight
- 227 KB
- Volume
- 18
- Category
- Article
- ISSN
- 0951-192X
No coin nor oath required. For personal study only.
π SIMILAR VOLUMES
Performance Optimization Using Extended
β
Magnus Broberg; Lars Lundberg; HΓ₯kan Grahn
π
Article
π
2001
π
Elsevier Science
π
English
β 487 KB
Effective virtual reality based building
β
Qing-Jin Peng; Xiu-Mei Kang; Ting-Ting Zhao
π
Article
π
2009
π
Institute of Automation, Chinese Academy of Scienc
π
English
β 776 KB
Fault self-organization as optimal rando
β
Miltenberger, Philippe; Sornette, Didier; Vanneste, Christian
π
Article
π
1993
π
The American Physical Society
π
English
β 359 KB
Optimal path for China's strategic petro
β
Y. Bai; D.Q. Zhou; P. Zhou; L.B. Zhang
π
Article
π
2012
π
Elsevier Science
π
English
β 612 KB
Structural dynamic shape optimization an
β
Jianping Zhang; Shuguang Gong; Yunqing Huang; Aihong Qiu; Renke Chen
π
Article
π
2007
π
Springer-Verlag
π
English
β 319 KB
Design optimization and dynamic analysis
β
Nizar Bel Hadj Ali; Landolf Rhode-Barbarigos; Alberto A. Pascual Albi; Ian F.C.
π
Article
π
2010
π
Elsevier Science
π
English
β 865 KB
Tensegrity structures are spatial structural systems composed of struts and cables with pin-jointed connections. Their stability is provided by the self-stress state in tensioned and compressed members. Although much progress has been made in advancing research into the tensegrity concept, a rapid s