✦ LIBER ✦
Criteria for the engineering and construction by TBM of a tunnel under the Torre Annunziata (Italy) built up area : Grasso, P; Pelizza, S; Turco, E; Vona, A Proc 6th Australian Tunnelling Conference, Melbourne, March 1987V1, P215–221. Publ Parkville: AusIMM, 1987
- Publisher
- Elsevier Science
- Year
- 1989
- Tongue
- English
- Weight
- 116 KB
- Volume
- 26
- Category
- Article
- ISSN
- 0148-9062
No coin nor oath required. For personal study only.