𝔖 Bobbio Scriptorium
✦   LIBER   ✦

Criteria for the engineering and construction by TBM of a tunnel under the Torre Annunziata (Italy) built up area : Grasso, P; Pelizza, S; Turco, E; Vona, A Proc 6th Australian Tunnelling Conference, Melbourne, March 1987V1, P215–221. Publ Parkville: AusIMM, 1987


Publisher
Elsevier Science
Year
1989
Tongue
English
Weight
116 KB
Volume
26
Category
Article
ISSN
0148-9062

No coin nor oath required. For personal study only.