Coupled-task scheduling on a single machine subject to a fixed-job-sequence
โ Scribed by F.J. Hwang; Bertrand M.T. Lin
- Publisher
- Elsevier Science
- Year
- 2011
- Tongue
- English
- Weight
- 923 KB
- Volume
- 60
- Category
- Article
- ISSN
- 0360-8352
No coin nor oath required. For personal study only.
โฆ Synopsis
This paper investigates single-machine coupled-task scheduling where each job has two tasks separated by an exact delay. The objective of this study is to schedule the tasks to minimize the makespan subject to a given job sequence. We introduce several intriguing properties of the fixed-job-sequence problem under study. While the complexity status of the studied problem remains open, an O(n 2 ) algorithm is proposed to construct a feasible schedule attaining the minimum makespan for a given permutation of 2n tasks abiding by the fixed-job-sequence constraint. We investigate several polynomially solvable cases of the fixed-job-sequence problem and present a complexity graph of the problem.
๐ SIMILAR VOLUMES
The majority of scheduling literature assumes that the machines are available at all times. In this paper, we study single machine scheduling problems where the machine maintenance must be performed within certain intervals and hence the machine is not available during the maintenance periods. We al
## 2003-2004 abstract and ke cword index specifically identify M. parafortuitum among a mixed microbial community in MWE It is also shown that the M. parafortuitum labeling methods are insensitive to the synthetic, semi-synthetic, and soluble oil MWF chemistries investigated. In addition, the use