Coordinated overhaul scheduling of production units
β Scribed by Moncer Hariga
- Publisher
- John Wiley and Sons
- Year
- 1994
- Tongue
- English
- Weight
- 539 KB
- Volume
- 41
- Category
- Article
- ISSN
- 0894-069X
No coin nor oath required. For personal study only.
β¦ Synopsis
This article presents a new approach to solve the problem of coordinating the overhaul scheduling of several nonidentical production units. For each production unit, we assume that the operating cost is an n-order polynomial function of the time elapsed since its previous overhaul. We develop an efficient iterative algorithm that generates a nearoptimal cyclic overhaul schedule. We also construct a simple algorithm for the case where the overhaul interval for each production unit and the cycle time are restricted to be power-of-two multiples of some base planning period. Finally, we provide a worst-case performance bound for the solution to the problem under the power-of-two restriction.
π SIMILAR VOLUMES