Contents volume 105
- Publisher
- Elsevier Science
- Year
- 1998
- Tongue
- English
- Weight
- 88 KB
- Volume
- 105
- Category
- Article
- ISSN
- 0377-2217
No coin nor oath required. For personal study only.
โฆ Synopsis
Viswanathan 43 Base stock policies for production/inventory problems with uncertain capacity levels R. G~II~ 52 Aggregate scheduling and network solving of multi-stage and multi-item manufacturing systems H.-J. Huang and G. Xu 66 A new constructive heuristic for the flowshop scheduling problem C. Koulamas 72 Time lag size in multiple operations flow shop scheduling heuristics J. Riezebos and G.J.C. Gaalman 91 Capacity planning by the dynamic multi-resource generalized assignment problem (DMRGAP) A. Shtub and K. Kogan 100 Searching for an optimal rotation age for forest stand management under stochastic log prices A. Yoshbttoto and L Shofi ! 13 Bayesian inferences for several autoregressive processes D. Salazar and D.IL Moen 118 Action-timing problem with sequential Bayesian belief revision process
๐ SIMILAR VOLUMES
A transformation method for numerical solution of the SchriSdinger equation 37 Jo6, I. Order-a radiative correction calculations for oriented allowed nuclear/3 decays 99
Sequence stratigraphy and stable isotopes (S13C, S'\*O) of the Late Cretaceous carbonate ramp of the western margin of the Iberian Chain (Soria, Spain) I. Valladares, C. Recio, A. Lendfnez.