๐”– Bobbio Scriptorium
โœฆ   LIBER   โœฆ

Construction Project Risk Assessment Using Existing Database and Project-Specific Information

โœ Scribed by Choi, Hyun-Ho; Mahadevan, Sankaran


Book ID
117994982
Publisher
American Society of Civil Engineers
Year
2008
Tongue
English
Weight
226 KB
Volume
134
Category
Article
ISSN
0733-9364

No coin nor oath required. For personal study only.


๐Ÿ“œ SIMILAR VOLUMES


Prediction of ecological no-effect conce
โœ Willem Roelofs; Mark A. J. Huikbregts; Tjalling Jager; Ad M. J. Ragsas ๐Ÿ“‚ Article ๐Ÿ“… 2003 ๐Ÿ› John Wiley and Sons ๐ŸŒ English โš– 91 KB

## Abstract A new method is proposed to derive predicted noโ€effect concentrations (PNECs) for initial risk assessments for aquatic ecosystems from a limited set of singleโ€species toxicity data. The method includes three steps. First, acute toxicity data are divided by an acuteโ€toโ€chronic assessment

Project risk evaluation using a fuzzy an
โœ Fatih Tรผysรผz; Cengiz Kahraman ๐Ÿ“‚ Article ๐Ÿ“… 2006 ๐Ÿ› John Wiley and Sons ๐ŸŒ English โš– 394 KB

Projects are critical to the realization of performing organization's strategies. Each project contains some degree of risk and it is required to be aware of these risks and to develop the necessary responses to get the desired level of project success. Because projects' risks are multidimensional,