Equations to calculate the duration of electrochemical chloride 8! extraction have been proposed and solved for the case of a constant z chloride concentration in the concrete or for a concentration following the error function trend. In the case of constant initial chloride content, both potentiost
Carbonation and electrochemical chloride extraction from concrete
β Scribed by N.M. Ihekwaba; B.B. Hope; C.M. Hansson
- Publisher
- Elsevier Science
- Year
- 1996
- Tongue
- English
- Weight
- 861 KB
- Volume
- 26
- Category
- Article
- ISSN
- 0008-8846
No coin nor oath required. For personal study only.
β¦ Synopsis
Chloride ingress into steel reinforced concrete (r.c.), and the subsequent application of electrochemical chloride extraction (ECE) are shown to be considerably retarded by the presence of a carbonation front. Four concrete blocks each reinforced with two layers of steel mats in two different configurations were electrochemically treated. One block of each type was initially carbonated to a depth of about 30 mm, and subsequently ponded with saturated chloride solution (as NaCl) for 18 months. Electrochemical treatment using an applied current density of 1 A/m2 of concrete surface was applied after sampling the concrete's chloride ion profiles. Carbonated concrete specimens operated at about twice as much polarizing voltage at the same applied current density as the non-carbonated concrete specimens. Higher chloride extraction was obtained in non-carbonated concrete than in carbonated concrete blocks irrespective of the configuration of the reinforcement system. Accumulations of alkali ions were greater in the non-carbonated concrete specimens in addition to higher initial chloride ion concentrations, and this was significantly greater in the specimens reinforced with different rebar mats at the top and lower sections. The changes in alkali ion accumulations followed a similar trend as chloride ion profiles. Hence, any softening effect due to these alkalies on the cement silicate hydrates is expected to be more pronounced in the non-carbonated than carbonated concrete. It is predicted that chloride contaminated concrete which has its cover considerably carbonated will likely show an inefficient ECE performance.
π SIMILAR VOLUMES
Electrochemical chloride removal was studied using prisms made from concrete containing various levels of chlorides derived from sodium chloride added during mixing. The amount of chloride removed during the treatment was assessed by analysing the anolyte. Chloride removal increased with increasing
## Abstract This paper presents field data from one of the first wellβdocumented reinforced concrete structures that has been rehabilitated with electrochemical chloride extraction (ECE) in the year 1989. The results of halfβcell potential mapping measured 1, 5 and nearly 20 years after the ECE tre
Structures of reinforced concrete attacked by chlorides from deicing salts can be repaired by use of electrochemical methods, such as Chloride Extraction (CE). This article describes an experiment to investigate the relationship between the electrical charge applied, the chloride contents in the con