𝔖 Bobbio Scriptorium
✦   LIBER   ✦

Bi-criteria single machine scheduling problem with a learning effect: Aneja–Nair method to obtain the set of optimal sequences

✍ Scribed by V. Mani; Pei Chann Chang; Shih Hsin Chen


Publisher
Elsevier Science
Year
2009
Tongue
English
Weight
519 KB
Volume
58
Category
Article
ISSN
0898-1221

No coin nor oath required. For personal study only.

✦ Synopsis


a b s t r a c t

In this paper, we consider the bi-criteria single machine scheduling problem of n jobs with a learning effect. The two objectives considered are the total completion time (TC ) and total absolute differences in completion times (TADC ). The objective is to find a sequence that performs well with respect to both the objectives: the total completion time and the total absolute differences in completion times. In an earlier study, a method of solving bi-criteria transportation problem is presented. In this paper, we use the methodology of solving bi-criteria transportation problem, to our bi-criteria single machine scheduling problem with a learning effect, and obtain the set of optimal sequences,. Numerical examples are presented for illustrating the applicability and ease of understanding.