๐”– Bobbio Scriptorium
โœฆ   LIBER   โœฆ

BASF moves into water treatment membranes with inge acquisition


Publisher
Elsevier Science
Year
2011
Tongue
English
Weight
53 KB
Volume
2011
Category
Article
ISSN
1359-6128

No coin nor oath required. For personal study only.

โœฆ Synopsis


president of the joint venture. "This new joint venture will enable us to produce and deliver complete water treatment solutions with shorter lead times, greater cost efficiency, and higher quality than existing competitive technologies."

KBR secures engineering contract for Texas water pipeline

K BR has won awarded an engi- neering contract for Section 14-2 of the Tarrant Regional Water District's proposed 350 million gallon per day (MGD) raw water transmission pipeline system serving Fort Worth and Dallas, Texas.

KBR will undertake the preliminary design for 15.2 miles of a 108" pipeline in Navarro and Ellis counties. The project is being jointly funded by Tarrant Regional Water District and Dallas Water Utilities, and is expected to extend from Lake Palestine to Lake Benbrook with connections to Cedar Creek Reservoir, Richland Chambers Reservoir and a Dallas, Texas delivery point.

The entire program includes more than 150 miles of large diameter pipelines.


๐Ÿ“œ SIMILAR VOLUMES