We consider a general class of multiprocessor shop scheduling problems, preemptive or non-preemptive, with precedence constraints between operations, with job or operation release dates, and with a class of objective functions including weighted sums of job, operations and stage completion times. We
β¦ LIBER β¦
Approximation algorithms for scheduling problems with a modified total weighted tardiness objective
β Scribed by Stavros G. Kolliopoulos; George Steiner
- Publisher
- Elsevier Science
- Year
- 2007
- Tongue
- English
- Weight
- 171 KB
- Volume
- 35
- Category
- Article
- ISSN
- 0167-6377
No coin nor oath required. For personal study only.
π SIMILAR VOLUMES
Approximation algorithms for shop schedu
β
Maurice Queyranne; Maxim Sviridenko
π
Article
π
2002
π
Springer US
π
English
β 166 KB
Parallel genetic algorithms for the earl
β
Chae Y. Lee; Seok J. Kim
π
Article
π
1995
π
Elsevier Science
π
English
β 863 KB
Approximation algorithms for UET schedul
β
Alexander A. Ageev; Alexei E. Baburin
π
Article
π
2007
π
Elsevier Science
π
English
β 167 KB
A genetic algorithm for job sequencing p
β
C.Y. Lee; J.Y. Choi
π
Article
π
1995
π
Elsevier Science
π
English
β 749 KB
An approximation algorithm for a single-
β
Eugeniusz Nowicki; CzesΕaw Smutnicki
π
Article
π
1994
π
Elsevier Science
π
English
β 679 KB
2-Approximation algorithms for the multi
β
Yoshiyuki Karuno; Hiroshi Nagamochi
π
Article
π
2003
π
Elsevier Science
π
English
β 180 KB
In this paper, given a path G with n vertices v1; v2; : : : ; vn and m identical vehicles, we consider a scheduling problem of the vehicles on the path. Each vertex vj in G has exactly one job j. Any of the n jobs must be served by some vehicle. Each job j has a release time rj and a handling time h