Production of radioisotopes in the BR2 h
β
Bernard Ponsard
π
Article
π
2007
π
John Wiley and Sons
π
French
β 414 KB
π 1 views
## Abstract The BR2 reactor, put into operation in 1963 and refurbished in 1995β1997, is a 100 MW highβflux βmaterials testing reactorβ which provides thermal neutron fluxes up to 10^15^ n/cm^2^ s. The production of radioisotopes, characterized by high specific activities, is carried out in dedicat