Resource-constrained project scheduling with cash flows occurs in many settings, ranging from research and development to commercial and residential construction. Although efforts have been made to develop efficient optimal procedures to maximize the net present value of cash flows for resource-cons
โฆ LIBER โฆ
Analysis of Scheduling Schemes and Heuristic Rules Performance in Resource-Constrained Multiproject Scheduling
โ Scribed by Antonio Lova; Pilar Tormos
- Book ID
- 110296158
- Publisher
- Springer US
- Year
- 2001
- Tongue
- English
- Weight
- 198 KB
- Volume
- 102
- Category
- Article
- ISSN
- 0254-5330
No coin nor oath required. For personal study only.
๐ SIMILAR VOLUMES
Heuristic scheduling of resource-constra
โ
Rema Padman; Dwight E. Smith-Daniels; Vicki L. Smith-Daniels
๐
Article
๐
1997
๐
John Wiley and Sons
๐
English
โ 82 KB
๐ 2 views
A new heuristic solution method in resou
โ
Colin E. Bell; Jaemin Han
๐
Article
๐
1991
๐
John Wiley and Sons
๐
English
โ 979 KB
A new heuristic method is presented for the resolution of multiresource constrained conflicts in project scheduling. In attempting to find a minimal makespan solution, the algorithm employs a simple procedure to generate a feasible solution with no backtracking. A postanalysis phase then applies a h
A Comparison of Heuristic and Optimum So
โ
Davis, E. W.; Patterson, J. H.
๐
Article
๐
1975
๐
INFORMS
๐
English
โ 748 KB
Heuristic algorithm for the resource con
โ
Wu, Y.-H.; Yu, C.-J.; Wang, S.-D.
๐
Article
๐
2009
๐
The Institution of Engineering and Technology
๐
English
โ 305 KB
A Comparison of Due Date Setting, Resour
โ
Douglas B. Bock; James H. Patterson
๐
Article
๐
1990
๐
Decision Sciences Institute, Georgia State Univers
๐
English
โ 862 KB
A branch and bound based heuristic for m
โ
Kripa Shanker; Bimal K. Modi
๐
Article
๐
1999
๐
Elsevier Science
๐
English
โ 125 KB