An integrated system to minimize the cost of analyzing construction claims
โ Scribed by S. Alkass; M. Mazerolle; F. Harris
- Publisher
- Elsevier Science
- Year
- 1993
- Weight
- 815 KB
- Volume
- 4
- Category
- Article
- ISSN
- 0956-0521
No coin nor oath required. For personal study only.
โฆ Synopsis
In recent years, more and more construction projects have terminated not on site but in the courtroom. Delays are a fact of life and, as a result, analyzing construction claims has become an integral part of the project's construction life. To prepare for litigation, schedule documentation proving responsibility must be prepared. With present methods of tracking projects, the preparation of such schedules can be both time consuming and costly. The analysis itself is usually complex and can be aided by a computerized approach. This paper presents an integrated system that aids in the analysis of claims resulting from delays occurring on construction projects.
๐ SIMILAR VOLUMES
The Model Base Management System (MBMS) in a Decision Support System (DSS) has become increasingly important in handling complicated decision problems. Traditionally, models are retrieved from the human experts. This approach has the disadvantages of low productivity and being subjective by differen
Environmental costs of products are closely related to their environmental impacts. This paper presents a methodology to estimate the environmental costs of products during the concept design phase by integrating a Simplified Life Cycle Assessment (SLCA) methodology with Economic Valuation (EV) meth