We consider the eigenvalue problem in the max-plus algebra for matrices in fรI Rg nรn but with eigenvectors in R n . The problem is relaxed to a linear optimization (LO) problem of which the dual problem is solved by ยฎnding a maximal average weight circuit in the graph of the matrix. The FloydยฑWarsh
An efficient critical path tracing algorithm for sequential circuits
โ Scribed by Hoon Chang; Jacob A. Abraham
- Publisher
- Elsevier Science
- Year
- 1994
- Weight
- 345 KB
- Volume
- 40
- Category
- Article
- ISSN
- 0165-6074
No coin nor oath required. For personal study only.
๐ SIMILAR VOLUMES
This paper presents an efficient linear-time sequential algorithm for constructing Hamiltonian paths between two given vertices in meshes with horizontal size m and vertical size n. The algorithm first partitions the given mesh into a number of submeshes in constant steps, and then constructs a Hami
In this article, we present an efficient computational implementation of an algorithm for finding the K shortest simple paths connecting a pair of vertices in an undirected graph with n vertices, m arcs, and nonnegative arc lengths. A minimal number of intermediate paths is formed based on the metho