An efficient branch-and-bound algorithm
✍
Wei-Chang Yeh
📂
Article
📅
2001
🏛
Society of Manufacturing Engineers
🌐
English
⚖ 826 KB
In this study, the two-machine bicriteria flowshop scheduling problem is addressed. The objective is to minimize a weighted sum of total flowtime and makespan. Different branch-and-bound algorithms have already appeared in the literature for this problem. In this study, a more efficient branch-and-b