𝔖 Bobbio Scriptorium
✦   LIBER   ✦

Alternate methods of project scheduling with limited resources

✍ Scribed by James H. Patterson


Publisher
John Wiley and Sons
Year
1973
Tongue
English
Weight
986 KB
Volume
20
Category
Article
ISSN
0894-069X

No coin nor oath required. For personal study only.

✦ Synopsis


Abstract

The applicability of critical path scheduling is limited by the inability of the algorithm to cope with conflicting resource demands. This paper is an assessment of the effectiveness of many of the heuristic extensions to the critical path method which resolve the conflicts that develop between the resources demanded by an activity and those available. These heuristic rules are evaluated on their ability to solve a large multiproject scheduling problem.


πŸ“œ SIMILAR VOLUMES