Algorithms for two-machine flow-shop sequencing with precedence constraints
β Scribed by A.M.A. Hariri; C.N. Potts
- Publisher
- Elsevier Science
- Year
- 1984
- Tongue
- English
- Weight
- 827 KB
- Volume
- 17
- Category
- Article
- ISSN
- 0377-2217
No coin nor oath required. For personal study only.
π SIMILAR VOLUMES
This paper deals with the problem of makespan minimization in a flow shop with two machines when the input buffer of the second machine can only host a limited number of parts. Here we analyze the problem in the context of batch processing, i.e., when identical parts must be processed consecutively.
We consider the problem of scheduling n independent jobs on two identical parallel machines, with a limit on the number of jobs that can be assigned to each single machine, so as to minimize the total weighted completion time of the jobs. We study a semideΓΏnite programming-based approximation algori