to immediately start construction work on the 15-month contract, worth up to US$65 million. The contract involves the construction of a 182 km, 24 inch pipeline from Al Ain to Qidfa, in Fujairah, and the construction of a pressure reducing metering station at Qidfa. The pipeline will have overall capacity to pump up to 360 million cubic feet per day of natural gas to the 656 MW power generation, and 100 million gallons a day water desalination project of the Union Water & Electricity Company (UWEC), presently under construction. The pipeline is to be commissioned by September 2003 to meet the feedstock needs of UWEC's project, which is to be completed in August 2003. CB&I SUPPLIES SEPARATION FACILITY TO QATAR CBI Eastern Anstalt, a Middle Eastern subsidiary of Chicago Bridge & Iron Co, has been awarded a lump sum turnkey contract by Occidental Petroleum for the engineering, procurement and construction of new oil/water separation facilities offshore Qatar.

Known as the PS-1 Produced Water Handling Facilities on Halul Island, CB&I will have turnkey responsibility for the engineering, procurement, installation and commissioning of new oil/water separation facilities for crude oil and produced water from Occidental's offshore PS-1 production complex.

The facilities will be able to process up to 435 000 barrels per day of liquids. The project involves the construction of two 150 000 barrel capacity separation tanks, crude oil pumping and fiscal metering facilities, pumping and filtration facilities, a remote flare system, a local


๐Ÿ“œ SIMILAR VOLUMES


Linde to build hydrogen plant for BASF
๐Ÿ“‚ Article ๐Ÿ“… 2008 ๐Ÿ› Elsevier Science ๐ŸŒ English โš– 51 KB

Several of Dow's existing chlor-alkali assets in Freeport are nearing the end of their economic life and would require significant investments to continue operation. The company will begin the process to shutdown those facilities over the next three years. ## Linde to build hydrogen plant for BASF