Adair goes native with new mexico power plant
- Publisher
- Elsevier Science
- Year
- 1999
- Tongue
- English
- Weight
- 139 KB
- Volume
- 1999
- Category
- Article
- ISSN
- 1365-6937
No coin nor oath required. For personal study only.
๐ SIMILAR VOLUMES
ciples on federal restructuring legislation, a rump group led by WPL Resources' Errol1 Davis and consisting of some 17 utilities met privately in Washington during the EEI confab to discuss their differences with EEI. EEI's new principles represent a bit of a softening from its previous "just say no
QSL technology provided the basis for the new lead smelter, which started operation from May 1992 at Onsan Refinery of Korea Zinc Co.. Ltd. The smelter is designed to treat not only various types of lead concentrates hut also secondary materials coming from the zinc plant without special pretreatmen
The status of power and desalting plants in Kuwait as well as future demands for power and desalted water are outlined. To satisfy future needs, it is planned to connect two multi-stage flash desalting units of 6 mgd each to a steam turbine producing electric power of 300 MW nominal capacity. Steam