A tree search algorithm for the crew scheduling problem
β Scribed by J.E. Beasley; B. Cao
- Publisher
- Elsevier Science
- Year
- 1996
- Tongue
- English
- Weight
- 871 KB
- Volume
- 94
- Category
- Article
- ISSN
- 0377-2217
No coin nor oath required. For personal study only.
π SIMILAR VOLUMES
## Abstract We describe a realβlife problem arising at a crane rental company. This problem is a generalization of the basic crew scheduling problem given in Mingozzi et al. [18] and Beasley and Cao [6]. We formulate the problem as an integer programming problem and establish ties with the integer
The Capacitated Shortest Spanning Tree Problem consists of determining a shortest spanning tree in a vertex weighted graph such that the weight of every subtree linked to the root by an edge does not exceed a prescribed capacity. We propose a tabu search heuristic for this problem, as well as dynami