๐”– Bobbio Scriptorium
โœฆ   LIBER   โœฆ

A shrunken cyclic inspection schedule for deteriorating production stages

โœ Scribed by Gad Rabinowitz


Book ID
104339308
Publisher
Elsevier Science
Year
1997
Tongue
English
Weight
788 KB
Volume
96
Category
Article
ISSN
0377-2217

No coin nor oath required. For personal study only.

โœฆ Synopsis


A single inspection facility is capable of multiple inspection tasks. This facility could be used for detecting out-of-specification production stages in multistage production systems. The purpose is to schedule the inspection over the different production stages so as to minimize the fraction of nonconforming items produced. A heuristic solution is proposed. The schedule is based on a relaxation of the original integer nonlinear scheduling problem. The relaxed problem provides upper bound and optimal sharing of the inspection efforts. Alternative cyclic schedules are then generated, shrunken and evaluated. The procedure performance is examined and further extensions are discussed.


๐Ÿ“œ SIMILAR VOLUMES