A semi-infinite programming model for earliness/tardiness production planning with simulated annealing

โœ Scribed by Y Li; D Wang


Publisher
Elsevier Science
Year
1997
Tongue
English
Weight
733 KB
Volume
26
Category
Article
ISSN
0895-7177

No coin nor oath required. For personal study only.

โœฆ Synopsis


To describe the earlings/tardincss production planning problems in the JIT environment, a nonlinear semi-infinite programming model was proposed in [I]. Due to a nonconvex objective function and infinitely many constraints, the model is difficult to solve by traditional methods. In this paper, simulated annealing method combined with a heuristic and the steepest descent method is developed.

Numerical results shows that the present approach is very efficient. In theory, the developed method is an attempt to solve a continuous domain problem by simulated annealing.