𝔖 Bobbio Scriptorium
✦   LIBER   ✦

A risk identification procedure for construction contracts—a case study of power station projects in Egypt

✍ Scribed by Hassanein, Amr A. G.; Afify, Hala M. F.


Book ID
120268924
Publisher
Taylor and Francis Group
Year
2007
Tongue
English
Weight
193 KB
Volume
24
Category
Article
ISSN
1028-6608

No coin nor oath required. For personal study only.


📜 SIMILAR VOLUMES


A comparison of several procedures to es
✍ Javier Llorca; Miguel Delgado-Rodríguez 📂 Article 📅 2000 🏛 John Wiley and Sons 🌐 English ⚖ 102 KB 👁 3 views

The estimation of a confidence interval for attributable risk from the logistic model based on data from case-control studies is a problem for which an accepted solution is lacking. Two methods, one based on the delta method and one bootstrap on the population base, have been described but their acc