๐”– Bobbio Scriptorium
โœฆ   LIBER   โœฆ

A review of methods and algorithms for optimizing construction scheduling

โœ Scribed by Zhou, J; Love, P E D; Wang, X; Teo, K L; Irani, Z


Book ID
125856776
Publisher
Palgrave Publishers Ltd.
Year
2013
Tongue
English
Weight
258 KB
Volume
64
Category
Article
ISSN
0160-5682

No coin nor oath required. For personal study only.


๐Ÿ“œ SIMILAR VOLUMES