Under single-level lot-sizing problem, well known Wagner-Whitin algorithm based on Dynamic Programming (DP) provides optimal order schedule. Order schedule does not work properly under Manufacturing Resource Planning (MRP II), where it is considered multi-level capaeitated problem and requirements o
โฆ LIBER โฆ
A preliminary model for lot sizing in semiconductor manufacturing
โ Scribed by Tali F. Carmon; Steven Nahmias
- Publisher
- Elsevier Science
- Year
- 1994
- Tongue
- English
- Weight
- 459 KB
- Volume
- 35
- Category
- Article
- ISSN
- 0925-5273
No coin nor oath required. For personal study only.
๐ SIMILAR VOLUMES
Manufacturing lot-sizing under MRP II en
โ
Hyun-Joon Kim; Yasser A. Hosni
๐
Article
๐
1998
๐
Elsevier Science
๐
English
โ 271 KB
A generalized lot sizing model for the p
โ
John P. Matthews
๐
Article
๐
1980
๐
Elsevier Science
๐
English
โ 684 KB
Lot sizing under (Q, R) policy in a capc
โ
Gabriel R. Bitran; Devanath Tirupati
๐
Article
๐
1984
๐
Elsevier Science
๐
English
โ 818 KB
Traditional approaches to lot sizing and inventory control consider uncertainties in either the demand or manufacturing process but not both. In these models it is usually assumed that the lead times are independent and identically distributed, but this is not realistic in many practical instances.
A production lot size inventory model fo
โ
K.L. Mak
๐
Article
๐
1982
๐
Elsevier Science
๐
English
โ 370 KB
A general approximation for the single p
โ
Marc R. Lambrecht; Nico J. Vandaele
๐
Article
๐
1996
๐
Elsevier Science
๐
English
โ 912 KB
A comparison of methods for lot-sizing i
โ
Wilco van den Heuvel; Albert P.M. Wagelmans
๐
Article
๐
2005
๐
Elsevier Science
๐
English
โ 188 KB