A polynomial-time open-shop problem with an arbitrary number of machines
β Scribed by S. V. Sevast'yanov
- Publisher
- Springer US
- Year
- 1992
- Tongue
- English
- Weight
- 911 KB
- Volume
- 28
- Category
- Article
- ISSN
- 1573-8337
No coin nor oath required. For personal study only.
π SIMILAR VOLUMES
The paper considers the open shop scheduling problem to minimize the makespan, provided that one of the machines has to process the jobs according to a given sequence. We show that in the preemptive case the problem is polynomially solvable for an arbitrary number of machines. If preemption is not a
We study the problem of minimizing the weighted number of late jobs to be scheduled on a single machine when processing times are equal. In this paper, we show that this problem, as well as its preemptive variant, are strongly polynomial. When preemption is not allowed ( 1"p H "p, r H " w H ; H ), t
## Abstract A new algorithm is introduced to perform the multiple time step integration of the equations of motion for a molecular system, based on the splitting of the nonbonded interactions into a series of distance classes. The interactions between particle pairs in successive classes are update