๐”– Bobbio Scriptorium
โœฆ   LIBER   โœฆ

A polynomial algorithm for no-wait cyclic hoist scheduling in an extended electroplating line

โœ Scribed by Ada Che; Chengbin Chu


Publisher
Elsevier Science
Year
2005
Tongue
English
Weight
349 KB
Volume
33
Category
Article
ISSN
0167-6377

No coin nor oath required. For personal study only.


๐Ÿ“œ SIMILAR VOLUMES


A genetic algorithm for a single hoist s
โœ Joon-Mook Lim ๐Ÿ“‚ Article ๐Ÿ“… 1997 ๐Ÿ› Elsevier Science ๐ŸŒ English โš– 352 KB

In this paper, the problem of determining cyclic schedules for a material handling hoist in the printedcircuit-board(PCB) electroplating line is considered. The objective of this research is to determine an optimal simple-cycle schedule of the hoist which in turn maximizes the line throughput rate.