A neural network-based build time estimator for layer manufactured objects
β Scribed by Luca Di Angelo; Paolo Di Stefano
- Publisher
- Springer
- Year
- 2011
- Tongue
- English
- Weight
- 464 KB
- Volume
- 57
- Category
- Article
- ISSN
- 0268-3768
No coin nor oath required. For personal study only.
π SIMILAR VOLUMES
This paper is concerned with modelling time series by single hidden layer feedforward neural network models. A coherent modelling strategy based on statistical inference is presented. Variable selection is carried out using simple existing techniques. The problem of selecting the number of hidden un
The manufacture of nylon involves the use of cyclohexane, whose successful production is strongly dependent on the kinetics and gas-liquid mass transfer of its oxidation. To properly design the cyclohexane oxidation process, both equipment and process variables must be considered; however, previous
Fuzzy clustering has played an important role in solving many problems. In this paper, we design an unsupervised neural network model based on a fuzzy objective function, called OFUNN. The learning rule for the OFUNN model is a result of the formal derivation by the gradient descent method of a fuzz