Resource-constrained project scheduling problems with cash flows (RCPSPCF) are complex, combinatorial optimization problems. Many heuristics have been reported in the literature that produce reasonable schedules in limited project environments. However, the lack of a heuristic that dominates under d
โฆ LIBER โฆ
A network flow procedure for project crashing with penalty nodes
โ Scribed by Arun Kanda; U.R.K. Rao
- Book ID
- 103793129
- Publisher
- Elsevier Science
- Year
- 1984
- Tongue
- English
- Weight
- 523 KB
- Volume
- 16
- Category
- Article
- ISSN
- 0377-2217
No coin nor oath required. For personal study only.
๐ SIMILAR VOLUMES
A metaheuristic scheduling procedure for
โ
Dan Zhu; Rema Padman
๐
Article
๐
1999
๐
John Wiley and Sons
๐
English
โ 244 KB
๐ 2 views
Unreliability evaluation for a limited-f
โ
Yi-Kuel Lin
๐
Article
๐
2006
๐
Elsevier Science
๐
English
โ 431 KB
This paper concentrates on a limited-flow network in which each node and branch has a designated capacity, which will have different lower levels due to various partial and complete failures. VCe try to evaluate the system unreliability that the maximum flow of the network is less than or equal to t
A Branch and Bound Procedure for the Res
โ
Icmeli, Oya; Erenguc, S. Selcuk
๐
Article
๐
1996
๐
INFORMS
๐
English
โ 991 KB
An Improved Method for Multistate Flow N
โ
Wei-Chang Yeh
๐
Article
๐
2011
๐
IEEE
๐
English
โ 183 KB