๐”– Bobbio Scriptorium
โœฆ   LIBER   โœฆ

A hybrid memetic algorithm for maximizing the weighted number of just-in-time jobs on unrelated parallel machines

โœ Scribed by F. Jolai; M. S. Amalnick; M. Alinaghian; M. Shakhsi-Niaei; H. Omrani


Publisher
Springer US
Year
2009
Tongue
English
Weight
644 KB
Volume
22
Category
Article
ISSN
0956-5515

No coin nor oath required. For personal study only.


๐Ÿ“œ SIMILAR VOLUMES


Maximizing the weighted number of on-tim
โœ C. Koulamas ๐Ÿ“‚ Article ๐Ÿ“… 1997 ๐Ÿ› Elsevier Science ๐ŸŒ English โš– 541 KB

The problem of maximizing the weighted number of on-time jobs on a single machine with time windows (STW) is shown to be strongly NP-hard. An efficient. heuristic is presented for STW. Computational experiments indicate that the performance of the heuristic is quite good.

Polynomial time algorithms for minimizin
โœ Philippe Baptiste ๐Ÿ“‚ Article ๐Ÿ“… 1999 ๐Ÿ› Springer US ๐ŸŒ English โš– 102 KB ๐Ÿ‘ 2 views

We study the problem of minimizing the weighted number of late jobs to be scheduled on a single machine when processing times are equal. In this paper, we show that this problem, as well as its preemptive variant, are strongly polynomial. When preemption is not allowed ( 1"p H "p, r H " w H ; H ), t