๐”– Bobbio Scriptorium
โœฆ   LIBER   โœฆ

A hybrid heuristic algorithm for the multistage supply chain network problem

โœ Scribed by Wei-Chang Yeh


Publisher
Springer
Year
2004
Tongue
English
Weight
413 KB
Volume
26
Category
Article
ISSN
0268-3768

No coin nor oath required. For personal study only.


๐Ÿ“œ SIMILAR VOLUMES


A comprehensive clustering algorithm for
โœ Mukundan Srinivasan; Young B. Moon ๐Ÿ“‚ Article ๐Ÿ“… 1999 ๐Ÿ› Elsevier Science ๐ŸŒ English โš– 205 KB

Inventory management in supply chain networks involves keeping track of hundreds of items spread across multiple locations with complex interrelationships between them. However, it is not computationally feasible to consider each item individually during the decision making process. The use of clust

A hybrid heuristic for the uncapacitated
โœ Sue Abdinnour-Helm ๐Ÿ“‚ Article ๐Ÿ“… 1998 ๐Ÿ› Elsevier Science ๐ŸŒ English โš– 991 KB

Given n interacting nodes in a network, the Uncapacitated Hub Location Problem (UHP) determines the number of hubs, the location for the hubs, and the assignment of the spokes to hubs that minimizes the overall transportation cost. The hubs are interconnected and each spoke is assigned to a single h