A hierarchical approach for the FMS scheduling problem
β Scribed by Jan Paulli
- Publisher
- Elsevier Science
- Year
- 1995
- Tongue
- English
- Weight
- 857 KB
- Volume
- 86
- Category
- Article
- ISSN
- 0377-2217
No coin nor oath required. For personal study only.
π SIMILAR VOLUMES
Flexible manufacturing systems (FMS) require intelligent scheduling strategies to achieve their principal benefitcombining high flexibility with high productivity. A mixed-integer linear programming model (MILP) is presented here for FMS scheduling. The model takes a global view of the problem and s
## Abstract We describe a realβlife problem arising at a crane rental company. This problem is a generalization of the basic crew scheduling problem given in Mingozzi et al. [18] and Beasley and Cao [6]. We formulate the problem as an integer programming problem and establish ties with the integer
In this paper, we propose a tabu search approach for solving the permutation flow shop scheduling problem. The proposed implementation of the tabu search approach suggests simple techniques for generating neighborhoods of a given sequence and a combined scheme for intensification and diversification
We study the problem of minimizing the makespan for the precedence multiprocessor constrained scheduling problem with hierarchical communications (Parallel Process. Lett. 10(1) (2000) 133). We propose an 8 5 -approximation algorithm for the Unit Communication Time hierarchical problem with arbitrary