An n job, single machine scheduling problem in which each job has a distinct due date, dd, is studied in this paper. The objective is to determine an optimal schedule Ir ยฐ for a set of jobs, S, such that the total absolute deviation of the schedule is minimized. This objective function is based on t
โฆ LIBER โฆ
A faster branch-and-bound algorithm for the earliness-tardiness scheduling problem
โ Scribed by Francis Sourd; Safia Kedad-Sidhoum
- Publisher
- Springer US
- Year
- 2007
- Tongue
- English
- Weight
- 434 KB
- Volume
- 11
- Category
- Article
- ISSN
- 1094-6136
No coin nor oath required. For personal study only.
๐ SIMILAR VOLUMES
A branch and bound approach for single m
โ
Pei Chann Chang
๐
Article
๐
1999
๐
Elsevier Science
๐
English
โ 660 KB
A faster algorithm for the maximum weigh
โ
Malcolm C. Fields; Greg N. Frederickson
๐
Article
๐
1990
๐
Elsevier Science
๐
English
โ 503 KB
A branch-and-bound parallel algorithm fo
โ
Mieczysลaw Wodecki
๐
Article
๐
2007
๐
Springer
๐
English
โ 265 KB
A branch and bound algorithm for the mul
โ
G. Carpaneto; M. Dell'amico; M. Fischetti; P. Toth
๐
Article
๐
1989
๐
John Wiley and Sons
๐
English
โ 814 KB
A branch and bound algorithm for the two
โ
A.M.A. Hariri; C.N. Potts
๐
Article
๐
1997
๐
Elsevier Science
๐
English
โ 654 KB
A branch and bound algorithm for the res
โ
Peter Brucker; Sigrid Knust; Arno Schoo; Olaf Thiele
๐
Article
๐
1998
๐
Elsevier Science
๐
English
โ 257 KB
A branch and bound algorithm is presented for the resource-constrained project scheduling problem (RCPSP). Given are n activities which have to be processed without preemptions. During the processing period of an activity constant amounts of renewable resources are needed where the available capacit