๐”– Bobbio Scriptorium
โœฆ   LIBER   โœฆ

A due-date assignment model for a flow shop with application in a lightguide cable shop

โœ Scribed by J.R. Rajasekera; M.R. Murr; K.C. So


Publisher
Society of Manufacturing Engineers
Year
1991
Tongue
English
Weight
487 KB
Volume
10
Category
Article
ISSN
0278-6125

No coin nor oath required. For personal study only.


๐Ÿ“œ SIMILAR VOLUMES


A queuing model for due date control in
โœ Joris Keizers; Ivo Adan; Jan van der Wal ๐Ÿ“‚ Article ๐Ÿ“… 2001 ๐Ÿ› John Wiley and Sons ๐ŸŒ English โš– 143 KB

## Abstract This paper deals with a repair shop with multiple parallel servers, which has to carry out planned overhauls. Each overhaul consists of a large number of maintenance jobs. The overhaul process is interrupted by randomly arriving emergency jobs. To control the delivery performance of the

Optimal assignment of slack due-dates an
โœ T.C.E. Cheng ๐Ÿ“‚ Article ๐Ÿ“… 1989 ๐Ÿ› Elsevier Science ๐ŸŒ English โš– 194 KB

This paper considers the problem of optimal assignment of slack due-dates to n jobs and sequencing them on a single-machine to minimize a penalty function depending on the values of the assigned slack allowance and maximum job tardiness. It is shown that the earliest due-date order yields an optimal