A critical review of nuclear power plant decommissioning planning studies
β Scribed by W.Timothy Lough; K.Preston White Jr.
- Publisher
- Elsevier Science
- Year
- 1990
- Tongue
- English
- Weight
- 835 KB
- Volume
- 18
- Category
- Article
- ISSN
- 0301-4215
No coin nor oath required. For personal study only.
π SIMILAR VOLUMES
## Abstract Driven by the increasing demand for reliable and clean energy, the nuclear industry is booming worldwide three decades after the Three Mile Island accident. The transition of technology in nuclear power plants has raised many important human performance issues in every aspect of control
## Abstract On August ninth, 2004, at the Mihama nuclear power plant in Japan, a carbon steel pipe line carrying hot water under high pressure burst, killing five workers employed in maintenance job nearby. The major cause for the burst was presumed to be the pipe wall thinning due to soβcalled ero