𝔖 Bobbio Scriptorium
✦   LIBER   ✦

A capacitated production planning problem for closed-loop supply chain with remanufacturing

✍ Scribed by Jian Zhang; Xiao Liu; Y L Tu


Book ID
105854029
Publisher
Springer
Year
2010
Tongue
English
Weight
370 KB
Volume
54
Category
Article
ISSN
0268-3768

No coin nor oath required. For personal study only.


πŸ“œ SIMILAR VOLUMES


Optimal policy for a closed-loop supply
✍ Shen-Lian Chung; Hui-Ming Wee; Po-Chung Yang πŸ“‚ Article πŸ“… 2008 πŸ› Elsevier Science 🌐 English βš– 885 KB

Previous researchers have developed ways of managing forward-oriented supply chains, and gave insight to solve single-stage inventory systems. In this study, we analyze an inventory system with traditional forward-oriented material flow as well as a reverse material flow supply chain. In the reverse

Building contingency planning for closed
✍ V.Daniel R Guide Jr.; Vaidy Jayaraman; Jonathan D Linton πŸ“‚ Article πŸ“… 2002 πŸ› Elsevier Science 🌐 English βš– 204 KB

## Abstract Contingency planning is the first stage in developing a formal set of production planning and control activities for the reuse of products obtained via return flows in a closed‐loop supply chain. The paper takes a contingency approach to explore the factors that impact production planni