Previous researchers have developed ways of managing forward-oriented supply chains, and gave insight to solve single-stage inventory systems. In this study, we analyze an inventory system with traditional forward-oriented material flow as well as a reverse material flow supply chain. In the reverse
β¦ LIBER β¦
A capacitated production planning problem for closed-loop supply chain with remanufacturing
β Scribed by Jian Zhang; Xiao Liu; Y L Tu
- Book ID
- 105854029
- Publisher
- Springer
- Year
- 2010
- Tongue
- English
- Weight
- 370 KB
- Volume
- 54
- Category
- Article
- ISSN
- 0268-3768
No coin nor oath required. For personal study only.
π SIMILAR VOLUMES
Optimal policy for a closed-loop supply
β
Shen-Lian Chung; Hui-Ming Wee; Po-Chung Yang
π
Article
π
2008
π
Elsevier Science
π
English
β 885 KB
Building contingency planning for closed
β
V.Daniel R Guide Jr.; Vaidy Jayaraman; Jonathan D Linton
π
Article
π
2002
π
Elsevier Science
π
English
β 204 KB
## Abstract Contingency planning is the first stage in developing a formal set of production planning and control activities for the reuse of products obtained via return flows in a closedβloop supply chain. The paper takes a contingency approach to explore the factors that impact production planni
A system dynamics model for dynamic capa
β
Dimitrios Vlachos; Patroklos Georgiadis; Eleftherios Iakovou
π
Article
π
2007
π
Elsevier Science
π
English
β 718 KB
Benders decomposition with alternative m
β
Halit Γster; Gopalakrishnan Easwaran; Elif AkΓ§ali; Sila Γetinkaya
π
Article
π
2007
π
John Wiley and Sons
π
English
β 216 KB
A multi-agent system to solve the produc
β
A. Kazemi; M. H. Fazel Zarandi; S. M. Moattar Husseini
π
Article
π
2008
π
Springer
π
English
β 337 KB
A queueing approach to production-invent
β
E. Teimoury; M. Modarres; F. Ghasemzadeh; M. Fathi
π
Article
π
2010
π
Society of Manufacturing Engineers
π
English
β 334 KB