In this paper, we consider the Steiner problem in graphs, which is the problem of connecting together, at minimum cost, a number of vertices in an undirected graph with nonnegative edge costs. We use the formulation of this problem as a shortest spanning tree (SST) problem with additional constraint
A branch-and-cut algorithm for the quay crane scheduling problem in a container terminal
✍ Scribed by Luigi Moccia; Jean-François Cordeau; Manlio Gaudioso; Gilbert Laporte
- Publisher
- John Wiley and Sons
- Year
- 2005
- Tongue
- English
- Weight
- 167 KB
- Volume
- 53
- Category
- Article
- ISSN
- 0894-069X
No coin nor oath required. For personal study only.
📜 SIMILAR VOLUMES
## Abstract In the swapping problem (SP), every vertex of a complete graph may supply and demand an object of a known type. A vehicle of unit capacity starting and ending its tour at an arbitrary vertex is available for carrying objects of given types between vertices. The SP consists of determinin
The Selective Traveling Salesman Problem (STSP) is defined on a graph in which profits are associated with vertices and costs are associated with edges. Some vertices are compulsory. The aim is to construct a tour of maximal profit including all compulsory vertices and whose cost does not exceed a p
In this paper, we present a branch-and-cut algorithm for the exact solution of an NP-hard extension of the well-known Minimum-Weight Arborescence (MWA) problem, in which resource constraints for each node are considered. This Resource-Constrained Minimum-Weight Arborescence (RMWA) problem arises, e.