A branch and bound algorithm to minimize the total tardiness for m-machine permutation flowshop problems
✍ Scribed by Chia-Shin Chung; James Flynn; Ömer Kirca
- Book ID
- 108116922
- Publisher
- Elsevier Science
- Year
- 2006
- Tongue
- English
- Weight
- 158 KB
- Volume
- 174
- Category
- Article
- ISSN
- 0377-2217
No coin nor oath required. For personal study only.
📜 SIMILAR VOLUMES
In a recent paper, Hamilton Emmons has established theorems relating to the order in which pairs of jobs are to be processed in an optimal schedule to minimize the total tardiness of performing n jobs on one machine. Using these theorems, the algorithm of this paper determines the precedence relatio
This paper considers an m-machine permutation flowshop scheduling problem of minimizing the makespan. This classical scheduling problem is still important in modem manufacturing systems, and is well known to be intractable (i.e., NP-hard). In fact branch-and-bound algorithms developed so far for thi