98/02261 Split stream boilers for high-temperature/high-pressure topping steam turbine combines cycles : Rice, I. G. J. Eng. Gas Turbines Power, 1997, 119, (2), 385–394
- Publisher
- Elsevier Science
- Year
- 1998
- Weight
- 196 KB
- Volume
- 39
- Category
- Article
- ISSN
- 0140-6701
No coin nor oath required. For personal study only.
✦ Synopsis
09 Combustion (burners, combustion systems) experimental study was then carried out to verify the model. The 300 MW once-through boiler system is used as an example. The capacity for heat recovery in the de-aerator tank was shown, by both the theoretical and the experimental analyses, to be largely dependent on the working pressure of the de-aerator tank and the starting vessel. In addition, the volume of the de-aerator tank, especially the volume of water, has a large effect on the heat recovery capacity.