𝔖 Bobbio Scriptorium
✦   LIBER   ✦

98/02255 Operation of an OP-230 boiler equipped with low-emission swirl burners at the Gdansk II Combined Heat Power Plant Installation and operational experience : Swietlik, K. et al. Energetyka, 1997, 51, (10), 531–540. (In Polish)


Publisher
Elsevier Science
Year
1998
Weight
196 KB
Volume
39
Category
Article
ISSN
0140-6701

No coin nor oath required. For personal study only.

✦ Synopsis


09 Combustion (burners, combustion systems) experimental study was then carried out to verify the model. The 300 MW once-through boiler system is used as an example. The capacity for heat recovery in the de-aerator tank was shown, by both the theoretical and the experimental analyses, to be largely dependent on the working pressure of the de-aerator tank and the starting vessel. In addition, the volume of the de-aerator tank, especially the volume of water, has a large effect on the heat recovery capacity.