𝔖 Bobbio Scriptorium
✦   LIBER   ✦

59th Geomechanics Colloquium


Publisher
Wiley (John Wiley & Sons)
Year
2010
Tongue
English
Weight
289 KB
Volume
3
Category
Article
ISSN
1865-7362

No coin nor oath required. For personal study only.


πŸ“œ SIMILAR VOLUMES


60th Geomechanics Colloquium
πŸ“‚ Article πŸ“… 2011 πŸ› Wiley (John Wiley & Sons) 🌐 English βš– 382 KB

## Abstract The 1,045 m long Himmelreich Tunnel lies on the route of the HausmannstΓ€tten bypass. The 253 m long loose ground section from the end of the investigation tunnel to the mined east portal was driven under the protection of an 18‐stage pipe canopy. The drilling rig can set each 18 m long

Proceedings of the 57th Geomechanics Col
πŸ“‚ Article πŸ“… 2008 πŸ› Wiley (John Wiley & Sons) 🌐 English βš– 80 KB

## Abstract Developments in geotechnics Penstock and cavern construction Investigation during construction and prediction models Tunnel construction with compressed air or ground freezing